Started in 2009 and completed in 2011 after a temporary shutdown, the storied Revel Casino Hotel was Chester’s largest lofted project to date. Working as a subcontractor for the talented Rich-Barham Mechanical, Chester fabricated the 170' x 70' oval indoor/outdoor pool in 22 sections, which were rigged through openings left in the curtain wall. Designed by STO Aquatics, Chester also fabricated two 30' x 12' spas, a massive Grotto therapy pool with a waterfall, a Koi pond, and a 10' x 20' overhead water feature with 3,000 lighted nozzles.