NEMA Boston
Boston, MA
NEMA Boston
The Pierce Boston project, which launched in the Spring of 2020, includes a custom spa with a raised deck. Built in a controlled environment at our Southern Indiana facility, the spa was fully finished, filled, and tested before being shipped to Boston. Upon arrival at the job site, the Chester Union Boilermakers skillfully utilized a tower crane to install the pool in less 45 minutes. This installation was carried out under contract with John Moriarty & Associates Inc.
ARCHITECT
SGA
GENERAL CONTRACTOR
John Moriarty & Associates, Inc.