top of page

Margaritaville NYC

New York, NY

Architect 

n/a

4th and Race Deck-Level Pool

General Contractor 

Mid-State Construction

Started in 2009 and completed in 2011 after a shutdown the storied Revel Casino Hotel was Chester’s largest lofted project to date. Working as a sub to the talented Rich-Barham Mechanical, Chester fabricated the 170’x70’ oval indoor/outdoor pool in 22 sections to be rigged through openings left in the curtain wall. Designed by STO Aquatics, Chester also fabricated two 30’x12’ spas, a massive Grotto therapy pool with waterfall, a Koi pond, and a 10’x20’ overhead water feature with 3000 lighted nozzles.

bottom of page